2017 Projects Schedule

Major Bridges

- schedule in progress

Crack Seal


County crews apply crack seal to paved roads as part of preventive maintenance to preserve asphalt pavement, April – May.

Dust Suppression


County crews combined with a contractor apply mag chloride for suppression to the County’s higher volume unpaved roads in May - June.

Annual Road Striping

The County selects a striping contractor to stripe roads in two sessions. The first as soon as weather and schedules allow around June and the second after the overlay and chip seal projects in September.

Asphalt Patching


County crews patch and repair asphalt roads as part of the pavement maintenance program.

Overlay/ Chipseal


July through August.

Culvert Replacement


Annual culvert replacements to maintain drainage ways.

Gravel Roads -

Annual regravel of roads by County crews.

Thanks for your patience during construction.