Routt County Road and Bridge has the following projects planned for the 2016 construction season:

Major Bridges - Replace two bridges in southwest Routt County on County Road (CR) 67. The Green Pipe Bridge (on CR 21) replacement will be completed in 2016. Construction of Green Pipe bridge began in fall 2015 and will run through September 2016. Replacement of the Butler Creek bridge (on CR 76) will begin in fall 2016 and continue into fall 2017. Bypasses will be available and CR 67 will remain open. (Completed)

Crack Seal - Crack seal application to various roads as part of preventive maintenance to preserve asphalt pavement, April – May. (Completed)

Dust Suppression - Apply dust suppression to the County’s higher volume unpaved roads beginning May 16th. This project will last approximately 6 weeks (weather permitting). (Completed)

Annual Road StripingAnnual striping of roads in road striping program. Begins June 20th for 3 weeks. 2nd striping of roads to be overlaid in September. (on Going)

Asphalt Patching - Annual patching to repair roads. June. (Completed)

Overlay - Scheduled to start August 24th. Approximate mileage listed below:

  • CR 16 CR 14 to CR 212, 1.5 miles - work will start 9/6 - 9/16/16
  • CR 14 US131 @ Oak Creek towards CR16, 2.4 miles - work will start 9/6 - 9/16/16
  • CR 15 US131 to CR17, 3.8 miles - work will start 8/24 - 9/1/16
  • CR 17 CR15 to Yampa, 4.5 miles - work will start 8/24 - 9/1/16

Culvert Replacement - Replace 4 small and 3 large culverts on CR 15 and CR 17 in South Routt. Work is projected to take place June - July depending on water flows. Roads will be periodically closed with detours via SH 131. (Completed)

Thanks for your patience during construction.

Please watch for and abide by flaggers, construction signs, and detours.